10/10/2025: The Hindu Kerala: Construction and demolition waste management plant proposed in Edayar industrial area

Posted On By
0 0
Read Time:12 Second

The government has proposed a construction and demolition waste processing plant with a capacity to process 100 tonnes to 150 tonnes per day on nearly two acres in the Edayar industrial area in Ernakulam. The project has been mooted under the…

About Post Author

Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %

Average Rating

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%

Leave a Reply

Your email address will not be published. Required fields are marked *