8/4/2025: Front Page: Three­tier system for floating solar plant project

Posted On By
0 0
Read Time:11 Second

The State is putting in place a three-tier system for the smooth implementation of floating solar power plants in waterbodies, including reservoirs, backwaters and water-filled quarries. Responsibilities will be shared among a high-level committee, an…

About Post Author

Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %

Average Rating

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%

Leave a Reply

Your email address will not be published. Required fields are marked *