0
0
Read Time:13 Second
The Kavach Version 3.2 has so far been implemented in about 1,465 km of the South Central Railway. The slow roll-out across the Indian Railways of Kavach, the indigenously developed Train Collision Avoidance System (TCAS), was due to the Railway…