Read Time:13 Second
The KRDCL-RVNL Joint Venture (JV) rm has been awarded the work to install automatic signal system in the 103-km Ernakulam Junction-Vallathol Nagar sector. The automatic block signal system under the ₹156.47-crore project ought to be completed in 750…