10/13/2023: MY DELHI: Work in progress

Posted On By
0 0
Read Time:12 Second

lllllA 6-lane elevated corridor from ESI Hospital to Punjabi Bagh Club Road Doubling of the Punjabi Bagh flyover Relocation of the existing subway ramp near ESI Hospital to both sides Construction of 2 new subways and a foot overbridge Strengthening…

About Post Author

Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %

Average Rating

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%

Leave a Reply

Your email address will not be published. Required fields are marked *